Web3314.5.1 Platform Spacing. Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between … Webrollers if the suspended platform is not more than 130 feet (or 39.6 meters) above a safe working surface; and An alternative stabilization system if a registered professional …
Fully Planked and Decked Scaffold Occupational Safety
WebDec 27, 2002 · (3) Dwelling Unit(s). At a dwelling unit, one 15A or 20A, 125V receptacle shall be located not less than 10 ft and not more than 20 ft from the water. This receptacle shall be located not more than 6 ft 6 in. above the floor, platform, or grade level serving the pool, outdoor spa or hot tub. WebSep 13, 2014 · a readily accessible place. They shall be installed such that. the center of the grip of the operating handle of the switch. or circuit breaker, when in its highest position, is not more. than 2.0 m (6 ft 7 in.) above the floor or working platform. Exception No. 1: On busway installations, fused switches. great clips minooka
OSHA Standard 29 CFR 1926.451: Scaffolds
Web3314.5.1 Platform Spacing. Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (25 mm) wide except where a qualified person can demonstrate that a wider space is ... Web1926.451(b)(1)(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the … Web(1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: (i) Each platform unit shall be installed so that the space between … great clips mission valley raleigh nc